Stockwood road safety improvements consultation
Our proposals have been developed with ward councillors following requests and concerns raised by members of the local community.
The plans form part of the Bus Route 2 project, which is looking to improve the number 2 bus route between Henbury and Stockwood. The wider project aims to make bus journeys more reliable and make routes safer and more accessible for people walking, wheeling and cycling.
Funding
The Bus Route 2 project is funded by the UK Government through the City Region Sustainable Transport Settlement (CRSTS), secured by the West of England Mayoral Combined Authority.
What is being proposed in Stockwood
The map shows the proposed changes in Stockwood. These include:
- Speed cushion pairs
- Accessible pedestrian crossing points
- Pavement build-outs and road narrowing
- A new zebra crossing
- Changes to parking near Hollway Road shops

Map of proposals in Stockwood. Click here for a larger image (opens in new window). Go to images/Subsites/Ask/Stockwood_Road_road_changes_A4_.png (opens new window)
Tell us what you think
Drop-in events
To find out more information and see the plans, join us at:
- Stockwood Market – Saturday 29 August from 10.30am to 1.30pm
- Stockwood Library – Friday 11 September from 10.30am to 1.30pm
Survey
The survey is open from 18 August to Tuesday 29 September 2026.
Alternative formats
If you need this survey in a different format, you can request this by:
- email: consultation@bristol.gov.uk
- phone: 0117 903 6449
A different format could be:
- a paper copy
- large print
- Easy Read
- braille
- British Sign Language
- a different language
Waxaad codsan kartaa qaabab kale oo dukumeentigan ah adigoo la xiriiraya consultation@bristol.gov.uk ama 0117 903 6449
Możesz poprosić o alternatywne formaty tego dokumentu, kontaktując się z consultation@bristol.gov.uk lub 0117 903 6449
Puteți solicita formate alternative ale acestui document contactând consultation@bristol.gov.uk sau 0117 903 6449
يمكنك طلب تنسيقات بديلة لهذا المستند عن طريق االتصال بـ
consultation@bristol.gov.uk
أو
0117 903 6449
تاسو کولی شئ د دې سند بديل فارميټونو غوښتنه وکړئ
consultation@bristol.gov.uk
يا
0117 903 6449
What happens next
We will take the results of the consultation into consideration before finalising the plans. Construction is expected to begin in mid-2027.
Key dates
- Start date: 18 August 2026
- End date: 29 September 2026