Western Harbour - Development Framework consultation
The Development Framework sets out ideas and guidance for the future of Western Harbour, giving consideration to new homes, transport, public spaces, heritage, nature and access to the waterfront.
Watch our short video for an overview of the proposals and how to take part:
About Western Harbour
Western Harbour is the name given to the regeneration project at the westernmost end of Bristol’s floating harbour, which includes Cumberland Basin, Spike Island and the road network around Ashton Meadows. It is a long-term regeneration project that will be delivered over many years.
Regeneration provides opportunities to:
- renew ageing road infrastructure
- provide new homes, including affordable homes
- improve walking, cycling and public transport connections
- improve public spaces and access to the waterfront
- protect and bring historic buildings back into use
- improve habitats and green spaces
Read more about Western Harbour and why regeneration is being considered.
Previous engagement
Following engagement and co-creation of a Vision for Western Harbour, that was endorsed by the council in 2022, we shared ideas for the future of Western Harbour in 2024 and 2025.
People broadly supported reducing the amount of land occupied by roads and creating a more connected and inclusive neighbourhood.
We have incorporated this feedback and further technical work to prepare the draft Development Framework.
Read the previous engagement materials and findings.
Why we have prepared a Development Framework
Western Harbour will change over several decades, so the plans need to be flexible enough to respond to further work on transport, flood protection, design and delivery.
Previous work has evolved into a Development Framework, bringing together the findings of previous engagement, policy requirements and technical evidence into a single document to guide the area's future regeneration.
The Development Framework sets out principles to guide future development rather than providing final designs.
The Framework also covers a larger area, including sites along Coronation Road and south of the New Cut. This will help future proposals for these sites to be considered as part of the wider area.
This is an important milestone in the Western Harbour journey. The Development Framework is not a planning application and does not grant planning permission for any specific proposals. Rather, it provides guidance for how future development, infrastructure investment and planning applications should come forward and be considered within the area.
Read the draft Development Framework
The draft Development Framework contains the full proposals, plans and illustrative ideas for Western Harbour.
You do not need to read the full document before completing the survey. The main proposals are summarised within the survey, with links to further information.
Tell us what you think
You can choose which parts of the draft Development Framework you want to comment on. You can also give your overall views without answering every section.
Some flood protection and landscape ideas overlap with the Avon Riversides 2100 project. These ideas are illustrative and may change as the detailed proposals are developed. A separate consultation on Avon Riversides 2100 is expected in early 2027.
The Western Harbour Development Framework consultation is open from 16 November to midnight on 4 January 2027.
Alternative formats
If you need this survey in a different format:
- email: western.harbour@bristol.gov.uk
- call: 0117 922 4409
A different format could be:
- Easy Read
- large print
- braille
- British Sign Language
- a different language
Waxaad codsan kartaa qaabab kale oo dukumeentigan ah adigoo la xiriiraya western.harbour@bristol.gov.uk ama 0117 922 4409
Możesz poprosić o alternatywne formaty tego dokumentu, kontaktując się z western.harbour@bristol.gov.uk lub 0117 922 4409
Puteți solicita formate alternative ale acestui document contactând western.harbour@bristol.gov.uk sau 0117 922 4409
يمكنك طلب تنسيقات بديلة لهذا المستند عن طريق االتصال بـ
western.harbour@bristol.gov.uk
أو
0117 922 4409
تاسو کولی شئ د دې سند بديل فارميټونو غوښتنه وکړئ
western.harbour@bristol.gov.uk
يا
0117 922 4409
What happens next
After the consultation closes, we will analyse the responses and publish a consultation report.
The findings will help inform the final Development Framework before it is presented to the Economy and Skills Policy Committee in 2027.
Western Harbour is a long-term project. There will be further opportunities to comment as more detailed proposals and individual projects are developed.
To receive project updates, sign up on the Harbour Hopes website.
Key dates
- Start date: 16 November 2026
- End date: 4 January 2027